This is the physical installation instructions specific to the diamond pattern.
This article is specific for the dual entry building only at this time.
What building layout are you working in?
Only one below.
This floorpan has a lower roof on the upstage wall.
Step 1 : Verify Height and determine size
Step 2: Rig Chain Hoists
Rig three chain hoists. One middle and two far offstage (next to side screens)
Hoist rigging photo below. All contents live in the chain bag.
Attach chain directly to pipe and secure before releasing the cheeseburgers currently holding the pipe.
Lower the pipe via the three hoists.
Pro Tip - Similar to lifting truss, have a spotter call level anytime the pipe is moving.
Pro Tip - When touching the chain and moving the pipe, wear gloves. Remove gloves to work on scenic to keep hands clean.